Trimley Mushroom Farm

Project timescale:
10 Weeks

Project Summary

  • Asbestos 78.22 Tons removed from site
  • Generl Rubbish 173.3 Tons removed from site with a 98.26% recycling rate
  • Crushed Concrete 2925.99 tons left on site for re-use
  • Hardcore 604.14 tons removed from site with a 100% recycling rate
  • Scrap Metal 38.42 tons left site with a 100% recycling rate
  • Green Waste 10.46 tons left site with a 80% recycling rate
  • Total man hours on site was 1,332