Case Study

Allied Bakeries – Norwich

Project timescale:
13 Weeks

Former Allied Bakeries located in Norwich
Project Value - TBC

Anglian were contracted to demolish the existing Allied Bakeries factory down to slab and lift the Concrete slabs

All departments of the Group were involved with this project keeping all aspects of the project in house aiding with the smooth running

The teams on site were once again well organised and are a credit to Anglian

Project Summary

  • 238.98 Tons of General Waste removed from site
  • 388.88 Tons of Scrap Metal removed from site
  • 6.68 Tons of Plasterboard removed from site
  • 55.76 Tons of Asbestos removed from site
  • 3,881.5 Tons of Crush Concrete removed from site
  • 3,428 Tons of Whole Concrete removed from site
  • 406 Tons of Crushed Brick Rubble removed from site
  • 2,652 Tons of Whole Rubble removed from site
  • 32,372L of Red Diesel used on site